4-lane Banihal bypass completed: Union Minister

Kashmir Age
By
Kashmir Age
News Room
We are a team of journalists, editors, and contributors committed to bringing authentic stories and reliable news from every corner of Jammu and Kashmir with integrity...
- News Room
1 Min Read

Union minister for Road Transport and Highways, Nitin Gadkari Sunday said that 4-lane bypass to Banihal town has been completed and will be fully operational within 15 days.

In a post on X (formerly Twitter), the minister, as per news agency—Kashmir News Observer (KNO) said that the 4-lane, 2.35 km bypass to Banihal town, built at a cost of Rs 224.44 crore has been completed.

“Strategically located on the Ramban–Banihal section of NH-44, the bypass features 4 viaducts spanning 1,513 meters and 3 culverts, effectively addressing the persistent bottleneck caused by roadside markets and shops,” he said.

He added that initially, 2-lane traffic will be released and 4-lane traffic shall be released after junction development within 15 days.

“This critical infrastructure ensures unhindered traffic flow, significantly reducing travel time and congestion for both tourists and defense vehicles en route to the Kashmir Valley. Beyond improving regional connectivity, the bypass strengthens national security logistics and enhances tourism prospects in the region,” the minister said—(KNO)

Share This Article
News Room
Follow:
We are a team of journalists, editors, and contributors committed to bringing authentic stories and reliable news from every corner of Jammu and Kashmir with integrity and professionalism.
22 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *